Projects Sukunka & Zonnebeke Wind Farms

Sukunka & Zonnebeke

Client: Enercon Canada Inc.
Location: Chetwynd, BC
Status: COMPLETE 2020
Tower Height: 135 m
Turbine Specification: 8 Wind Turbines E-126 EP3 135 m MST

Scope of Work:

  • Offloading, assembling, leveling, grounding, and grouting the T Flange of the tower on top of the foundation. The Contractor will supply the grouting tools and material that will be needed.
  • The offloading of the WECs, tools, Material and any items needed during the installation work.
  • The pre assembly of the WECs and Material.
  • The assembly of the WECs and Material.
  • Decommission