Trinity Hills Wind Farm
Owner: Contract with Vestas-American Wind Technology, Inc
Location: Texas, USA
Status: COMPLETE 2020
Tower Height: 77.4m
Turbine Specification: 84 Wind Turbines – Existing Rotor: C96 2.5MW IEC 2B
Scope of Work:
- Remove Clipper blades, Hub, Turbine Nacelle, gearbox, pad mount transformer, and power distribution panel.
- Receive and offload Supplier blades, Tower Adapter Sections, Turbine Nacelles, Hubs, and miscellaneous parts at the Delivery Point.
- Transport miscellaneous parts to existing Wind Turbine locations for install.
- Prepare Turbine Nacelle and Hub for installation.
- Install Supplier Adapter Section, Turbine Nacelle, blades and Hub.
Cranes:
- 3 – 16000 Manitowic Crawler Crane
- 1 – LR 1600